Important MCQ questions for GATE, ESE Engineering Service Examination, IES, PSU Examination and Study Material For Electrical and Electronics Engineering in Circuit Theory, Network Theory, Material Science, Power System, Control System, Measurement, Power Electronics, Transformer and Electrical Machine, Control System, EMT, Power Electronics, Microprocessor and Communication System.
Tuesday, April 26, 2016
Transmission of power to a load over transmission line achieves optimum value when standing-wave ration (SWR) becomes
No comments:
Post a Comment